S-2.1, r. 9 - Regulation respecting concrete pumps and distribution masts

Full text
52. The log contain the following information:
(1)  the number of hours of use per day and the cumulative number of hours of use;
(2)  the type of regular and preventive maintenance work;
(3)  the content of the general tests described in sections 55 and 56;
(4)  the results of the non-destructive tests provided for in section 57; and
(5)  the type of repairs, the name of the person who did the repairs and the date the work was carried out.
O.C. 1520-92, s. 52.